typical case: 3. building intelligent system integration
3.1 china energy construction beijing gezhouba building intelligent system project
☆ construction unit: china energy construction group co., ltd.
☆ project scale: 36,223,300 yuan
☆ duration: december 2012-june 2013
☆ main work content: the intelligent system
of this project includes: data network system, voice system, integrated wiring system, security system (including video monitoring, intrusion alarm, patrol, security integration platform), cable tv system, wireless signal coverage system (including wireless intercom, wireless local area network), all-in-one card system (including attendance, consumption, access control, conference sign-in, visual intercom, parking lot management), multimedia information publishing system, information computer room project. the work content includes the overall system plan design, goods procurement, system installation and test opening and so on.
☆social benefits: this project is constructed in accordance with the standard of 5a office building, realizes the requirements of intelligent management and application of the building, improves the efficiency and quality of building operation and management, and brings a comfortable and safe environment and efficient and convenient management support to the building. energy construction group provides advanced office and information infrastructure and services.
☆ highlights in technology and management: the project is technically designed in accordance with 5a-level intelligent standards, using current advanced design concepts and building intelligent technology, and each system is based on a high-speed and stable computer network and adopts ip architecture and introduced advanced technologies such as ftth intelligent building system integration. the implementation of this project has a wide range of subsystems. the project department has created a wbs for the project, decomposing the deliverables of the project into smaller task units, and assigning the task units to the corresponding professional engineers and construction personnel to achieve the "contract" the project management objectives of contract performance, satisfaction of related parties, social reputation and economic benefits.
3.2 the intelligent system project of gezhouba urban garden complex building
☆ construction unit: china gezhouba group real estate co., ltd.
☆ project scale: 4.3814 million yuan
☆ duration: november 2016-june 2017
☆ main work content: the intelligent system of the project mainly includes: video security monitoring system,intrusion alarm system,electronic inspection system,entrance and exit control system,parking guidance management system(including guidance system), communication access system,integrated wiring system,computer 15 subsystems including network system,wireless coverage system,digital wireless intercom system,elevator five-party intercom system,broadcast system,information release and query system, construction equipment monitoring system,computer room and supporting projects.
☆social benefits: the intelligent system of the project has established a set of social service system to meet the different service needs of users in the building. it provides users in the building with a safe and comfortable living and working environment, high-quality information and communication network, and convenient service facilities, which improves the quality of the building. at the same time, as the infrastructure and important management method of property management, it greatly reduces the operation and management of the building. cost.
☆ highlights in technology and management: in the process of project construction, our company puts the safety elements of the building first in terms of project deepening design and product selection, and strengthened the quality control and equipment of each process of the system during the construction process the performance test guarantees the overall quality of the project and the stability of the system. after the completion of the project, it played an active role in the operation process, and achieved good results in security and prevention.
typical case: 3. building intelligent system integration
3.1 china energy construction beijing gezhouba building intelligent system project
☆ construction unit: china energy construction group co., ltd.
☆ project scale: 36,223,300 yuan
☆ duration: december 2012-june 2013
☆ main work content: the intelligent system
of this project includes: data network system, voice system, integrated wiring system, security system (including video monitoring, intrusion alarm, patrol, security integration platform), cable tv system, wireless signal coverage system (including wireless intercom, wireless local area network), all-in-one card system (including attendance, consumption, access control, conference sign-in, visual intercom, parking lot management), multimedia information publishing system, information computer room project. the work content includes the overall system plan design, goods procurement, system installation and test opening and so on.
☆social benefits: this project is constructed in accordance with the standard of 5a office building, realizes the requirements of intelligent management and application of the building, improves the efficiency and quality of building operation and management, and brings a comfortable and safe environment and efficient and convenient management support to the building. energy construction group provides advanced office and information infrastructure and services.
☆ highlights in technology and management: the project is technically designed in accordance with 5a-level intelligent standards, using current advanced design concepts and building intelligent technology, and each system is based on a high-speed and stable computer network and adopts ip architecture and introduced advanced technologies such as ftth intelligent building system integration. the implementation of this project has a wide range of subsystems. the project department has created a wbs for the project, decomposing the deliverables of the project into smaller task units, and assigning the task units to the corresponding professional engineers and construction personnel to achieve the "contract" the project management objectives of contract performance, satisfaction of related parties, social reputation and economic benefits.
3.2 the intelligent system project of gezhouba urban garden complex building
☆ construction unit: china gezhouba group real estate co., ltd.
☆ project scale: 4.3814 million yuan
☆ duration: november 2016-june 2017
☆ main work content: the intelligent system of the project mainly includes: video security monitoring system,intrusion alarm system,electronic inspection system,entrance and exit control system,parking guidance management system(including guidance system), communication access system,integrated wiring system,computer 15 subsystems including network system,wireless coverage system,digital wireless intercom system,elevator five-party intercom system,broadcast system,information release and query system, construction equipment monitoring system,computer room and supporting projects.
☆social benefits: the intelligent system of the project has established a set of social service system to meet the different service needs of users in the building. it provides users in the building with a safe and comfortable living and working environment, high-quality information and communication network, and convenient service facilities, which improves the quality of the building. at the same time, as the infrastructure and important management method of property management, it greatly reduces the operation and management of the building. cost.
☆ highlights in technology and management: in the process of project construction, our company puts the safety elements of the building first in terms of project deepening design and product selection, and strengthened the quality control and equipment of each process of the system during the construction process the performance test guarantees the overall quality of the project and the stability of the system. after the completion of the project, it played an active role in the operation process, and achieved good results in security and prevention.